Tuesday, January 27, 2009
Building Bridges Completed
I took this video on the way to work this morning. The train I was on was a bit of a groaner, a good sound effect for the video. With the realignment, all the existing single track between Westgarth and the bridge was replaced. The train I am travelling on is on the new track and bridge. Very smooth, I must say.
The fact that on both of my trips through this section today we crossed another train going in the opposite direction tells me that the nay sayers are wrong. What were/are the nay sayers saying? That this would move the problem to Clifton Hill. However, being a flat junction there will always be delays at Clifton Hill, it's a fact of life, but I think it will be better than before. No more sitting at Westgarth for 5 minutes in the morning, and Epping trains will hopefully flow more freely as a result. We shall see how it goes over the next few weeks as normal loads resume.
Subscribe to:
Post Comments (Atom)
1 comment:
They should've stuck a grade separation in at Westgarth station...that's a busy road that one.
Post a Comment